The exam consists of 60 multiple-choice questions that are based on scenarios and solutions. The exam duration is 90 minutes, and the passing score is 60%. The exam covers topics such as VxRail deployment, installation, configuration, management, and troubleshooting. Candidates who pass the exam will earn the EMC Proven Professional - Specialist - Implementation Engineer, VxRail certification.
NEW QUESTION # 58
An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION # 59
A company has multiple VxRail systems installed at geographically dispersed data centers They want to upgrade all their VxRail systems to the latest release- Before the upgrade, they want an inventory report of all the VxRail systems which shows the current health status and versions of all installed VxRail components.
What should be used to meet these requirements?
- A. VxRail Plugin for vCenter Server
VxRail API - B. Mitrend
VxRail Log insight - C. itrend
Live Optics - D. VxRail Plugin for vCenter Server
DRM Services
Answer: B
NEW QUESTION # 60
What is the correct CLI command to collect only the vCenter logs on VxRail Manager
- A. vc-support.sh -v
- B. generateFullBundle.py -v
- C. vc-support-bundle.sh -c
- D. generateLogBundle.py -c
Answer: D
NEW QUESTION # 61
What is a requirement for the vSAN Data-at-Rest Encryption?
- A. External customer provided vCenter
- B. VxRail with at least 3 nodes
- C. All-Flash or AII-NVMe VxRail
- D. External Key Management Server
Answer: D
NEW QUESTION # 62
From what location should NVT for VxRail be run?
- A. VxRail network Top of Rack switch
- B. Workstation on the same network as VxRail Manager
- C. Jump server on a different network
- D. Laptop connected to the first VxRail ESXi node
Answer: D
NEW QUESTION # 63
A VxRail Cluster has just been deployed. Use the VxRail simulator to determine the Service Tag, Model, and ESXJ IP Address of the first node - vcluster730.esx01.edu.local.
Note: It is necessary to dose (x) the simulator window before you can select a response to this question.






- A. Option B
- B. Option D
- C. Option A
- D. Option C
Answer: B
NEW QUESTION # 64
What is the correct sequence of steps to perform a RASR Factory Reset using an SD card?
Answer:
Explanation:
NEW QUESTION # 65
From what location should NVT for VxRail be run?
- A. VxRail network Top of Rack switch
- B. Jump server on a different network
- C. Workstation on the same network as VxRail Manager
- D. Laptop connected to the first VxRail ESXi node
Answer: C
NEW QUESTION # 66
An implementation engineer is deploying a VxRail cluster with the VxRail Deployment Wizard Which user accounts must be defined for VxRail Manager?
- A. VxRail Manager root account VxRail Manager service account
- B. vCenter root account VxRail Manager service account
- C. VxRail Manager service account vCenter service account
- D. VxRail Manager root account vCenter service account
Answer: A
NEW QUESTION # 67
A systems engineer is deploying a VxRail cluster. They want to ensure that configuration issues can be avoided when expanding this cluster.
Which actions need to be performed?
- A. Validate that the latest updates and patches are installed in the system Validate that no pending and unfinished jobs are running on the servers
- B. Validate that no pending and unfinished jobs are running on the servers Verify that the server and storage components are working properly
- C. Verify VxRail nodes are racked and connected to the ToR switches
Validate the network environment - D. Verify the configuration settings initially captured in PEQ
Validate the storage environment
Answer: A
NEW QUESTION # 68
A 2-node VxRail duster Is being deployed. Due to a preparation mistake, the host section fe missing. Use the VxRail simulator to fully deploy the cluster using the JSON file.
Node Names:
vcluster-esxO 15-vrack
vcluster-esxO 16-vrack
Starting IP
Address: 192.168.10.15
Rack Name: Virtual Rack
Rack Position: 15-16
Passwords: Passwordl23
!
ESXI Management
User: esxmgmt
When you have finished, continue to the next question.




Answer:
Explanation:
Pending
Send your suggestions for this question.
NEW QUESTION # 69
A VxRail D560 cluster was delivered six months ago and now needs to be prepared for installation with the target code. What is the correct method to complete the task?
- A. Boot into RASR USB and perform a RASR Reset
- B. Boot into RASR ISO and perform a Factory Reset
- C. Boot into RASR ISO and perform a RASR Reset
- D. Boot into SD card and perform a Factory Reset
Answer: C
NEW QUESTION # 70
Which VxRail model(s) has a non-mirrored IDSDM?
- A. D560/F
- B. All G Series
- C. S570
- D. All E Series
Answer: B
NEW QUESTION # 71
What is a characteristic of the VxRail S Series node?
- A. Dense Flash disks
- B. Form factor of 1U1N
- C. Form factor of 2U4N
- D. Large form factor drives
Answer: A
Explanation:
NEW QUESTION # 72
An implementation engineer is tasked with setting up RecoverPoint for VMs on a single G Series chassis. How many VMs are licensed to be protected on the cluster?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
NEW QUESTION # 73
An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible What action must be performed before adding the node?
- A. Order node with correct image
- B. Compute node expansion
- C. RASR Factory Reset
- D. RASR Factory Image Upgrade
Answer: A
NEW QUESTION # 74
Use the VxRail simulator to explore the system. What is the presented configuration?
Note: It fs necessary to close (x) the simulator window before you can select a response to this question.




- A. External vCenter and external DNS
- B. Internal vCenter and Internal DNS
- C. External vCenter and internal DNS
- D. Internal vCenter and external DNS
Answer: D
NEW QUESTION # 75
An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?
- A. Single power zone must be used with adequate power cables
- B. At least 36 in (92 cm) clearance exists in front of and behind the cabinet
- C. Power distribution must support the power rating of a single node
- D. Service laptop must be on the same IP network as the iDRACs
Answer: C
NEW QUESTION # 76
What is validated by running the Proactive VM Creation test in vCenter on a VxRail cluster?
- A. vSAN operates successfully
- B. Network performance is sufficient
- C. vSAN has sufficient storage capacity
- D. Network firewalls are configured correctly
Answer: A
NEW QUESTION # 77
What is a valid 2-node VxRail cluster configuration?
- A. 2x 10 GbE and 2x 25 GbE in a switch configuration and external vCenter
- B. 2x 1 GbE and 2x 10 GbE in a switch configuration and internal vCenter
- C. 2x 1 GbE and 2x 10 GbE in a direct-connect configuration and external vCenter
- D. 2x 10 GbE and 2x 25 GbE in a direct-connect configuration and internal vCenter
Answer: C
NEW QUESTION # 78
Match each VxRail data protection solution with its functionality.
Answer:
Explanation:
NEW QUESTION # 79
......
Fully Updated Dumps PDF - Latest DES-6322 Exam Questions and Answers: https://pass4sure.dumps4pdf.com/DES-6322-valid-braindumps.html